P&TECH Co., Ltd.

History

HISTORY

Semiconductor & Solar
Furnace Global
Leading Company

2023
  • Developed Ultra High Temp Furnace for SiC Wafer Process
  • Developed Ultra High Temp Furnace for SiC
  • Development of PE-CVD Nitride Furnace
    Supplied to JA, SPIC, KIER
2022
  • Supplied 8" Vertical Furnace to SK Hynix System IC
2021
  • Supplied 12" Vertical Furnace to SK Siltron
2020
  • Exported 8" Vertical Furnace to China
  • Development of Big Size Wafer LP-CVD
    Supplied to LONGi, CHINT, JA Solar, KIER
2019
  • Developed 6", 8", and 12" Vertical Furnace Equipment for Semiconductor Manufacturing
  • Development of 12" Vertical Furnace Supplied to SK Siltron
2018
  • Supplied Solar Cell Mass Production Equipment to LONGi, REC, and JA Solar
  • Development of 8" Vertical Furnace Supplied to Hynix System IC China
2017~2020
  • Development of High Productivity LP-CVD
    Supplied to LONGi, JA, SPIC, REC
2017
  • Fuel Cell H2 Restoration Furnace Supplied to LG Electronics
2016
  • LONGi Development of n-TOPCon Cell Furnace
    Supplied to LG Solar (LPCVD, Activation, PECVD)
  • Graphene CVD Furnace Supplied to LG Electronics
2015
  • Development of I-BC Cell Furnace
    Supplied to LG Solar (Control Ox, LPCVD, LP POCL3, Passivation)
2013~2016
  • Supplied Solar Cell Manufacturing Furnace Equipment to LG Solar (240 Tubes)
2013
  • Development of N-PERT
    Activation Supplied to LG Solar
2012
  • Maintenance Service for SK Hynix Semiconductor Furnace Equipment
  • Development of 8" High Temp Furnace
  • Supplied to Hynix System IC
  • Development of 6" High Temp Furnace
  • Supplied to VISHAY Taiwan
2010
  • First Overseas Export of Solar Equipment (PECVD) to China
  • Development of POCL3 Diffusion
    Supplied to DMB, LG Solar
  • ION Chemical Glass Consolidation Furnace Supplied to Gionix
2008
  • Development of 12" Horizontal Furnace
  • Supplied to LG Siltron / Supplied to Waferworks
2007
  • First Independent Overseas Export of Solar Equipment (B/D, PECVD)
2006
  • First Independent Overseas Export of Solar Equipment (B/D, PECVD) to China and Taiwan
  • Development of 8" Horizontal Furnace
  • Supplied to Zhonghuan Semiconductor, Tianjin, China
2005
  • Exclusive Export of Semiconductor Equipment Parts to Samsung Electronics and Hynix
2003
  • Completed Hynix Semiconductor Equipment Relocation Project
    (Icheon → Cheongju)
2002~2005
  • TEL/KE 6”, 8” Furnace
  • Refurbish SK Hynix, Samsung
2002
  • Established P&Tech Co., Ltd.
    Registered as an Official Vendor of Hynix Semiconductor